Plan tab options

Previous  Top  Next

Optionsplan

 

Options - Plan

 

When checked the plan list will not be automatically reloaded on start of the program. This will result in a blank plan list when the program is started.

 

If a complete plan list is loaded from an external file the drill time of each play in the file will be used and overwrite the drill time in the database if the overwrite play info option is checked.

 

Pressing the OK button will store the changes and bring you back to the main window.

 

Pressing the Apply button will store your changes.

 

The Cancel button will bring you back to the main window, no changes will be made.